Sonntag, 19. März 2006
close gear ratio inside
richarzzz, 13:45h
i get the fresh rebuilt gearbox (scat glose geares) on friday (schwarzwaldperformace, thank's to armin) and started immidiatly to install it. after moments of unknowledgement if it will fix right, i become a boost of adrenalin as i saw it could work well on the rised tranny fork. so i start to cut some pices out of the fork to have some space for the heavy duty c.v. joints.
installation was done in a few minutes and i installed the engine, also. so the saturday was a perfect day, especially the sun shines on me as i was working outside the garage without gloves and beanie.
installation was done in a few minutes and i installed the engine, also. so the saturday was a perfect day, especially the sun shines on me as i was working outside the garage without gloves and beanie.
... comment